All of the equipment is fully adaptable to the needs of the most diverse projects. The types of projects KCU can assist with, in particular those where its location is in an environmentally sensitive area include, Civil Construction, Mining Services and Installation and Maintenance of Underground Utilities.
The EcoPlough adopts a trenches technique installing cables or pipes of up to 315 millimetres in diameter. The cable or pipe is laid immediately behind a specifically designed ploughing blade at an installation rate of up to 1,000 metres per hour.
It delivers many benefits including increased safety with less personnel/heavy equipment interaction, reduced environmental impact from a reduced footprint and increased speed and cost effectiveness. There are 3 of these in the fleet.
The Veltz 900 is equipped with a McElroy butt welding machine that is suitable for pipe diameter ranges between DN500 – DN900 and includes a 4000 Watt heater plate and a hydraulic facer. Its specific compact design perfectly fits into the cabin and easily operated.
It is the most advanced PE Butt-Welding Crawler suitable for all types of HDPE pipeline construction. It can also be configured for Fast Fusion Welding. To the best of KCU’s knowledge, there are only 3 of these machines in Australia.
Our fleet are regularly service and maintained by our local team. What ever the project we have the equipment to facilitate.
38x Wheel Loaders
30x Excavators
9x Water Trucks
9x 740 Articulated Dump Trucks
3x Dozers
3x Graders
2x HD45 Dump Trucks
2 x Rollers
16x Cone Crushers
11x Screening Plants
7x Jaw Crushers
8x Prime Movers
8x Side Tippers
3x Ditch Witch – JT2020
2x Ditch Witch – JT922
2x Ditch Witch – 30-20AT
4x Vermeer – D20X22
3x Vermeer – D7X11
41x Poly Fusion Welding Machines
4x Vacuum pipe lifters
3x MF20 Fast Fusion Welding Machines (in cab welding)
4x Vermeer T955
2x Vermeer T755
2x Vermeer T1055
1x Trencor T1260D
1x Astec T560