FMG Dewatering Operations

KCU continues to run one of the largest dewatering programs in the southern hemisphere for FMG.  We have installed approximately 100 kilometres of dewatering pipelines annually over the past five years.  This includes deposition lines, decant lines and bore field lines in both HDPE and steel.  The scope includes valving, manifolds, pump stations and approximately 100 abstraction bores and injection bores per annum.

CLIENT

Fortescue Metals Group

LOCATION

Cloudbreak, Christmas Creek & Solomon Mine sites, WA

DURATION

2013 to present

VALUE

$15 – 30 million per year (current)

KCU PROJECTS INCLUDED

  • Long Cocos Stage 2: 21 kilometres of DN 620 pipe
  • Zone G Injection Bore Field: 14.3 kilometres of 630 PN 6.3 pipe and 15 injection units
  • West 1 Bulk Main Upgrade: 9.6 kilometres of 630 PN 6.3 pipe
  • Windich Bulk Main: 9 kilometres of DN 630 pipe
  • Vasse Decant Line: 8 kilometres DN 355 PN 6.3 pipe
  • Windich Decant Return Lines: 8 kilometres DN 355 PN 6.3
  • OPF Water Supply: 6.4 kilometres of 630 PN 12.5 pipe
  • Hook Strip 20-29: 6 kilometres of PN 6.3 pipe in various sizes
  • Vasse Deposition Line: 4 kilometres PN 16 DN 450 and 31 spigots
  • Flinders Tailings & Decant Lines: 1.8 kilometres HDPE lined carbon steel tailings pipework DN 450 and 3.2 kilometres of HDPE Decant Return pipe work DN 450