FMG Ponds

KCU was contracted to build a series of three settlement and transfer ponds (Kangaroo Turkey Nest, Norfolk Transfer and CC2 Settlement Ponds) across both the Cloudbreak and Christmas Creek mine sites.

CLIENT

Fortescue Metals Group

LOCATION

Cloudbreak and Christmas Creek, WA

DURATION

8 months

VALUE

$4 million

SERVICES INCLUDED

  • Dewatering below the water table
  • Excavation, placement, compaction earthworks as per the supplied drawings
  • Supply and install 1.5mm HDPE liner and Geotextile underlay
  • Supply and install suction piping, including supports and vortex breaker as per the supplied drawings
  • Supply and install miscellaneous items including pond egress safety equipment, life buoys, level indicators and fencing
  • Construction verification and handover as per SOW